(The first entry in this series.)

Welcome back!

In this post, we continue our exploration of what possibilities Dependency Map can bring to SAFe planning!

In the last instalment, we learned how to bring together issues from several different projects into the same map. The Sprint grouping rule puts sprints that share a name, such as Sprint 1, into one column, and a Value filter hides the Backlog column. That leaves a coherent SAFe Program Board. (You can find out more about SAFe here: https://www.scaledagileframework.com.)

Example of a SAFe program board using Dependency Map

Example of a SAFe program board using Dependency Map

Let’s move on to dependency management, which is — arguably — the most important part of all work planning processes!

In the SAFe framework, dependencies are identified and dealt with during the team breakout sessions in the PI Planning meeting. This is where the team members figure out how the features to be built fit together technically. The idea is to identify features that cannot be delivered until one or several other features have been delivered. For example, it might not be possible to deliver the design of a media infotainment system for a car unless the full specifications for the electrical system and the interior design for the instrument panel are complete.

Creating Jira links with Dependency Map

Using the standard Jira interface to add links to issues can be a bit cumbersome, but this is where Dependency Map can help! Jira has a built-in link type called “Blocks” which is included in all maps by default. Here’s how to add a new link between two issues:

  1. Click the lock icon to enable editing
  2. Click on the issue you want to link from — note how a “Drag to create link” handle appears in the bottom right corner
  3. Drag from the create link handle and drop it on the issue you want to link to.
  4. A “Choose link type” popup appears
  5. Click the link type you want to create (e.g. “Blocks”) and the link is created.

Program board with add link animation

To remove a link, click it and click the delete icon on the link.

Read more about Creating and editing links with Dependency Map for Jira.

That’s all there’s to it!

Now that we know how to create links quickly in Dependency Map, it’s easy to complete the Program Board. (If several persons are working in the same map simultaneously, you may have to reload the page to see the current version of the map.) The result might look something like this:

Program board with dependencies

Visualising feature complexity

Now that we have a general overview of who’s doing what (and when), we can continue to explore the project in other ways. One question we might want to ask is whether the plan is reasonable given the (estimated) complexity of the features to be implemented.

Let’s begin by assuming that we have a custom field in Jira called “Complexity” with three different possible values: “Low”, “Medium” and “High”.

Next we want to create a Dependency Map visualising complexity:

  1. Open the program board map
  2. Expand the configuration form and click “Save As”
  3. Name the new map, e.g. “Program Board – complexity”
  4. Click OK to save.

Next, configure the map to visualise Complexity as the issue color:

  • Select the Issue color field: Complexity
  • Optionally:
    • Adjust the sort order
    • Customise the color of the complexity values
  • Save the map when done

Setting and customizing complexity colors in a program board

Our new map now looks like this:

Program board with color by complexity

We can see that features that block other features tend to be more complex than features that do not — which makes sense. We can also see that the majority of the features planned for our next three sprints are of medium complexity. Team Delta, however, have been assigned two low complexity features in sprint 1, and none of them depend on anything else.

Something that may be cause for concern is that Team Alpha have been assigned a larger number of features than the other teams in sprint 1, and none of them have low complexity. Whether this is a problem depends on what we know about Team Alpha, of course. If the team is experienced and confident, it may not be a problem at all. But visualising the project in this way provides a perspective that points our attention to a kind of problem that can be difficult to “see” in a standard program board.

Let’s try another perspective!

Visualising project status

Once our first sprint is underway, it is likely that we want to see what the overall status of the project is.

Let’s duplicate the Program Board map again, and select “Status” as the field for issue colors:

  1. Expand the configuration form and click “Save As”
  2. Name the new map, e.g. “Program Board – status”
  3. Click OK to save.
  4. For “Issue color field”, select Status
  5. Click Save to persist your changes

Note that in this example, we have added a status called “At risk” to the project workflow. This isn’t part of the standard set of statuses in Jira, but it can be useful since it allows us to distinguish between features that are in progress according to plan and features that risk being delivered late.

The new map gives us this:

Program board with color by status

This proves that our fears about Team Alpha may have been correct after all! The red feature called “AL-2” is now at risk, but there is now an additional concern: if “AL-2” is at risk, this also means that feature “BE-4” is likely to be at risk too, because of the dependency. This is particularly bothersome because “AL-2” is expected to be delivered to Team Beta in the current sprint. At this point we should talk to the teams about how to mitigate the problem.

An additional headache is the feature called “BE-1”: it is also at risk, which might cause a delay of “AL-10” (which is planned for the next sprint). However, it may be OK to let “BE-1” slip into sprint 2, since there is still a possibility that Team Beta can deliver it to Team Alpha in time for them to complete “AL-10”.

If we want to highlight these kinds of dependency related problems even further, we can create a copy of our Jira filter and configure the new filter to only include issues that “blocks” or are “blocked by”:

Jira filter to only include blocked issues

Using this filter in the status map gives us this result:

Program board with only blocked issues

This visualisation helps us see dependency-related problems immediately, without the additional clutter of “independent” issues.

This concludes our two-part series on how SAFe program boards can be created in Dependency Map. Hopefully, these posts have provided you with at least some ideas of what’s possible to do! Feel free to download a free trial from Atlassian Marketplace and experiment!